vercel/workflow
main · 7740388Cached · audited 10 September 2026vercel/workflow could not be verified end to end inside DX Score's execution budget.
Nine areas
Findings
Three, ranked by severity. Every one carries the command that proves it and a prompt that closes it.
pnpm run build was not observed within DX Score's 10-minute execution budget
pnpm run build was still running when our 10-minute execution budget ended; the standard allows 15 min for the magic path and 10 min for local development. Nothing here has failed — we did not see the end of it, so the affected gates and areas are UNVERIFIED rather than scored.
Point DX Score at a smaller workspace member, or reduce first-build time; every planned step completes inside the 10-minute budget and the affected gates read pass or fired.
Hard gates
A gate fires only on an observed failure. Our execution budget is 10 minutes; the standard allows 15; a gate the budget cut before it could be observed reads unverified.